63-hour bridge closure (8/20-8/23), OVERNIGHT bridge closures WED. 8/23 and THUR. 8/24, click here for details

The Connecticut Department of Transportation is issuing the follow traffic advisory for road closures of Route 82 over the Connecticut River (East Haddam Swing Bridge).

 

63-Hour Bridge Closure:

 

  •  Full bridge closure to vehicles, cyclists, and pedestrians will begin Sunday (8/20) at 8pm, the bridge will reopen on Wednesday (8/23) at 11am.

 

To review this year’s 63-hour closure calendar click here

 

Overnight Bridge Closures:

 

In addition to the 63-hour bridge closure occurring this week, the contractor will also be performing overnight bridge closures as follows:

 

  • Wed. night into Thur. morning – 11pm to 6am
  • Thurs. night into Fri. morning – 11pm to 6am

 

Any changes to these scheduled closures will be communicated.

 

DETOUR INFO

 

Motorist alternative options to cross the Connecticut River during these bridge closures will be as follows:

 

Traveling to/from the South – Use the signed detour utilizing the Baldwin Bridge (I-95 Old Saybrook).

 

Traveling to/from the North – utilize the Arrigoni Bridge (Middletown-Portland).

 

Please be advised:

 

·       We are now sending TEXT Alerts for bridge closures and re-openings, closure cancellations, and any emergency closures. To Opt-in, text the word SWINGBRIDGE to 888777. (Message and Data rates may apply). In addition to SMS messages, if you would like to receive Swing Bridge open/closed status notices via email or a voice call from Everbridge, please click here to enter the required information. Message and data rates may apply. Reply HELP for help, STOP to Opt-out.

 

·       Effective Nov. 11, 2022, any trucks that exceed 16 tons are restricted from using the East Haddam Swing Bridge, until further notice. Routine enforcement by the Connecticut State Police and Department of Motor Vehicles will continue to occur during this 16-ton restriction period.

 

·       Project WEBCAMS for monitoring traffic conditions on the bridge (one on each side of the river) and tide board clearance for maritime are available 24/7, the camera feeds are viewable from our project website homepage.

 

If you have any questions related to construction, please send an e-mail to [email protected]